Windows
November 5, 2009
After a long wait, most of the windows finally arrived from
Serious Windows. It took us a couple
of hours to get them all sorted out and delivered to their respective areas of
the house. Dan and Bruce installed the fiberglass casement windows in the
entryway and bedrooms, and these went up fairly quickly. We are still waiting
for some of the larger window units, as well as the nailing flanges that will
let us install the vinyl windows in the workshop and porches.

November 6, 2009
With the kind assistance of the roofing crew, the large south window assembly of the cottage
great room was lifted into place. The narrow windows on the right and left sides
are openable casement windows, and the others are fixed. That way we can get a
breeze without screens obscuring the center view.
